
The pods are suspended from the roof structure using precision-engineered hangers. Each pod ring contains approximately five cubic meters of concrete and is finished with either full-height glazing or stainless-steel mesh and balustrade.
BESIX Watpac is proud of the project team’s focus on delivering a facility that adheres to the highest standards of quality, which has left a positive legacy for the school’s students who will be able to enjoy the very best there is to offer when it comes to STEM education.
In the video below, you can see the Brisbane Grammar School - STEAM project in images, and traditional land owners during the Smoking Ceremony, the traditional ceremony where indigenous people purge the construction site at the start of the works.
)
)
)
)