A cast iron pipe 600 mm in diameter was inserted underneath the site to pump the water from the company site to the basin. This feat over a distance of more than 200 m was carried out by Van den Berg. The project is an example of how complex works can be successfully completed through an integrated approach between various BESIX Infra entities.